Ghani Glass Karachi – LPG Vaporizer Installation

Project Name

Ghani Glass – LPG Vaporizer Installation

Location

Landhi, Karachi

Vaporizer 

ETV-500 (2 sets)

Capacity: 500 kg/hr

Heater Capacity: 75 kw

Application

Furnaces

Scope

Supply, Installation and Comissioning of Vaporizer

Supply and Installation of Fisher Pressure Regulator

Fabrication of LPG Pipeline Complete Network from in-take point to feed-in of furnaces.

Project Gallery

  • GGL Khi (4)
  • GGL Khi (5)
  • GGL Khi (6)
  • GGL Khi (7)
  • GGL Khi (8)
  • GGL Khi (1)
  • GGL Khi (2)
  • GGL Khi (3)